This section contains information regarding the installation of the classic concrete and replaceable timber border systems designed and installed by Bocce Builders of America. Additional construction techniques involve the installation of a timber only border using either stacked timber materials or typical post and plank systems.
![]()
A picture is worth a thousand words. We form the perimeter of the bocce court (in the left situation below, there are actually 2 courts side by side) using 2" x 12" or 2" x 6". Normally it's best to use 2" x 6" so you can tie them together prior to pouring. These ties keep the forms from expanding out with the pressure of the concrete. If we use 2" x 12" boards, they must be staked and kicked more often.

![]()
The next process involves laying and tying steel rebar in the perimeter border foundation. As you can see, we also hang the steel so it stays more to the center of the concrete and doesn't fall to the ground. Bocce Builders uses both #3 and #4 rebar in the foundation wall.